What this tool does
Works out the weight of rolled lead sheet for a run of flashing from its length, strip width and lead code, with the pieces and laps the run needs, a wastage allowance, the rolls to buy and the cost per kilogram.
Run length plus a lap at each joint, times strip width and the code's weight per square metre, gives the lead to buy; rolls and cost follow.
People also use
Formula Used
How the lead flashing calculator works
Lead flashing is bought by the roll and priced by the kilogram, so the job is to turn a run along a chimney or a wall into a weight. The run is the length to be covered. The strip width is the girth of the flashing, laid flat. The code sets the thickness, and thickness sets the weight: Midland Lead's weight chart gives the sum as length in metres × width in metres × thickness in millimetres × 11.34, the weight in kilograms of a square metre of lead one millimetre thick. The calculator uses the same figures, so Code 4 at 1.80 mm comes to 20.41 kg/m².
A flashing is not fitted as one long strip. Lead moves as it heats and cools, so a run is made up of short pieces that overlap at each joint, and every overlap is lead you buy on top of the run itself. The calculator works out how many pieces the run needs at the piece length you set, adds one lap for each joint, and then adds your wastage allowance. The defaults are pieces of 1.5 m (about 4 ft 11 in) with 100 mm (4 in) laps. Those are the limits UK specifications commonly quote from the code of practice BS 6915. The standard is sold, not published, so we cannot link it; treat both figures as defaults to confirm.
Take 8 m of cover flashing in Code 4, 300 mm wide. At 1.5 m a piece it needs 6 pieces and 5 laps, so 8.50 m of lead. Add 5% and it is 8.93 m, or 2.68 m², which weighs 54.6 kg (120.5 lb). At £4.20 a kilogram the lead costs £229.52. Rolls change the bill, though. Two 6 m rolls weigh 36.7 kg each and cost £308.60, while three 3 m rolls give 9 m for £231.45.
Typical lead flashing wastage
The laps are counted separately, so the wastage allowance only has to cover what is cut off and not used: the ends trimmed at corners, the triangles lost when a step flashing is cut to follow the brick courses, and the odd piece that is spoiled. The default is 5%, which is our own starting figure and not a published one. A straight cover flashing along one wall can come in under it. A chimney with four sides, a back gutter and stepped sides will use more, because every change of direction leaves an offcut too small to use elsewhere.
The larger loss is usually in the rolls. Lead comes in fixed lengths, and whatever is left on the last roll has been paid for. The result shows the cost of the lead the job needs and the cost of the whole rolls side by side, so you can see what a different roll length would save. Offcuts are not worthless. Midland Lead puts the recycled rate of lead sheet above 99%, and scrap merchants buy it.
What this tool does not do
It prices one run of one width. A chimney usually needs several: a front apron, stepped side flashings, a back gutter and soakers under the tiles, each with its own width and often its own code. Run the calculator for each and add the results. It does not choose the code or the width for you, and it does not check the detail: the height of the upstand, how far the flashing is turned into the mortar joint, or how the free edge is clipped. Fixings, clips, wedges, sealant and patination oil are extra. It also knows nothing about the metal price on the day you order.
On-site considerations for lead flashing
Lead is poisonous, and that should shape how the work is done. The World Health Organization's fact sheet on lead poisoning says there is no known safe blood lead concentration, and that young children can absorb four to five times as much lead as adults from the same swallowed dose. The UK Health and Safety Executive explains how it gets into the body: by breathing in lead dust, fume or vapour, and by swallowing it when you eat, drink, smoke or bite your nails without washing your hands and face first. Its construction guidance adds washable or disposable gloves where lead dust is likely, and tells you to keep children and pregnant women away from the work area. Take offcuts and sweepings away with you.
Then there is the weight and the height. A 6 m roll of Code 4 at 300 mm wide weighs 36.7 kg (81 lb), and a Code 5 roll 450 mm wide weighs 68.6 kg (151 lb), so plan how each one gets up to the roof before it is delivered. Flashing work is done at the roof edge or beside a chimney, where a fall is the main risk. In Great Britain the Work at Height Regulations apply; other countries have their own rules, and a safe working platform is the starting point under any of them.
Codes and compliance
The lead codes used here are British. Rolled lead sheet is made to BS EN 12588 in Codes 3 to 8, and Midland Lead lists the thicknesses as 1.32, 1.80, 2.24, 2.65, 3.15 and 3.55 mm. The code number is close to the weight in pounds per square foot: Code 4 at 20.41 kg/m² is 4.18 lb/ft², and Code 5 at 25.40 kg/m² is 5.20 lb/ft². That helps if your supplier sells sheet lead by the pound. For which code goes where, the same maker's guide to lead thickness gives Codes 3 and 4 for soakers and Codes 4, 5 and 6 for chimney, apron and cover flashings.
For how it is fitted, the British Board of Agrément certificate for Midland's cast lead sheet names BS 6915, BS 5534 and the Lead Contractors Association's guide as the documents to follow, and says the largest size for a single piece should be taken from BS 6915. Outside the UK the standards and the trade practice are different, and lead-free flashings are widely sold. Check what applies where you are before you order.
Before you order
Measure each run along the line the flashing will take, up the slope for a side flashing and not on plan. Pick a width the merchant stocks. Midland Lead's answers to common questions give the usual flashing widths as 150, 240, 300, 390, 450 and 600 mm, in rolls of 3 m and 6 m. Ask whether a stocked width a little wider than you need costs less than having a strip cut. Then compare roll lengths against the length the result shows, because the leftover on the last roll is where the money goes. Ask the price per kilogram on the day, since lead follows the metal market, and ask what a roll actually weighs: the chart allows 5% either way on the theoretical figure.
Adjusting the defaults
Every field can be changed. The run and the strip width are your measurements. The code is a choice from the list. Piece length and lap start at 1.5 m and 100 mm; shorten the pieces or lengthen the lap if your specification or your roofer says so, and the piece count and the lead length follow. Set the lap to 0 to see the bare run. Wastage starts at 5%. The roll length is 3 m or 6 m. The price is a placeholder until you put your own quote in, and the currency symbol follows your browser's region.
Using this lead flashing calculator alongside other BuildMetricLab tools
For pressed metal flashings sold by the piece, such as drip edge and step flashing on a shingle roof, the roof flashing calculator counts pieces instead of weight. The ridge cap calculator covers the ridge and hips, and the roof area calculator gives the slope area for the tiles. All BuildMetricLab tools run in your browser with no sign-up, and the formula is on the page so the maths can be checked.
Sources & methodology
Pieces = 1 if the run fits in one piece, otherwise ceil((run − lap) ÷ (piece length − lap)). Lead length = run + (pieces − 1) × lap. Length to buy = lead length × (1 + wastage %). Weight = length to buy × strip width × mass per m², where mass per m² = thickness in mm × 11.34 for the BS EN 12588 codes: Code 3 1.32 mm (14.97 kg/m²), Code 4 1.80 mm (20.41), Code 5 2.24 mm (25.40), Code 6 2.65 mm (30.05), Code 7 3.15 mm (35.72), Code 8 3.55 mm (40.26). Rolls = the larger of ceil(length to buy ÷ roll length) and ceil(pieces ÷ whole pieces that fit one roll), since each piece is cut whole from a roll; weight per roll = roll length × strip width × mass per m². Cost of lead required = weight × price per kg; cost of whole rolls = rolls × weight per roll × price per kg. 1 kg = 2.2046 lb. The 1.5 m piece length and 100 mm lap are defaults commonly quoted from BS 6915, and the 5% wastage is our own allowance; all three are inputs.
- Midland Lead: Lead flashing weight chart (weight = pieces × length × width × thickness in mm × 11.34; ±5% tolerance)
- Midland Lead: What thickness of lead do I need for my project? (code thicknesses and which codes suit soakers and flashings)
- Midland Lead: Frequently asked questions (standard 3 m and 6 m rolls; flashing widths 150 to 600 mm)
- British Board of Agrément: Certificate 86/1764 for Midland Lead cast lead sheet (installation to BS 6915, BS 5534 and the Lead Contractors Association guide)
- World Health Organization: Lead poisoning fact sheet (no known safe blood lead concentration)
- Health and Safety Executive (Great Britain): Lead, when are you most at risk? (how lead is absorbed)
- Health and Safety Executive (Great Britain): Construction hazardous substances, lead (gloves, hygiene, keeping children away)
- Health and Safety Executive (Great Britain): Work at height
Frequently asked questions
Are lead flashing calculator results accurate enough to order materials?
For the weight, yes, if the run, the strip width and the code are right: the sum is length × width × the code's weight per square metre, plus the laps and your wastage. Rolled lead has a tolerance of about 5% on its theoretical weight, so a roll can weigh a little more or less than shown. Check the number of rolls against the lengths your merchant stocks before ordering.
What wastage percentage should I use?
The default is 5%, which is our own starting figure. Laps are added separately, so wastage only covers offcuts. A straight cover flashing may need less; a chimney with stepped sides and a back gutter will need more, and 10% is a fair figure to try for that.
Does this replace professional advice?
No. It works out a weight and a cost. It does not choose the lead code, design the upstands and laps, or check the fixing detail, and lead is a toxic material fitted at height. A trained leadworker or roofer should confirm the specification, and local rules on lead and on work at height apply.
Can I change the unit prices?
Yes. Enter your supplier's price per kilogram and both cost rows update: one for the lead the job needs and one for the whole rolls you would have to buy. The default is only a placeholder, because lead prices move with the metal market.