Calculates the pavers or paving slabs needed for an area, with wastage and cost

Updated October 14, 2026 · Live

What this tool does

Calculates the number of pavers or paving slabs for a patio, path or driveway from the area, the paver size (entered as the laying module including the joint) and a wastage allowance for cuts and breakages, with pavers per square metre or square foot and the cost at your price.

Enter the area, the paver size including its joint, a wastage percentage and the price per paver; the calculator returns the pavers to buy, the count before wastage, the pavers per square metre or foot and the cost.

Inputs
ft²
in
in
%
$
Result

Pavers Required

106

Paved Area
215.0 ft²
Paver Module
18.0 in × 18.0 in, 2.25 ft² each (enter the unit plus its joint)
Pavers per ft²
0.44
Before Wastage
96 pavers to cover the area exactly
Wastage Allowance
+10%: 10 more for cuts at edges and breakages
Estimated Cost
$477.00 for the pavers only, at the entered price each
Price it on PlainEstimate

Opens these materials as a new estimate on PlainEstimate, our free estimate and invoice app.

Plain Estimate
From BrightScale Labs
Invoice maker
Quote at the door. Signed on the spot.
Estimates and invoices for trades, built while you are still in the room.
Scan to get
Get it onGoogle Play

People also use

Formula Used
N=⌈ApL⋅pW⋅(1+w)⌉N = \left\lceil \frac{A}{p_L \cdot p_W} \cdot (1 + w) \right\rceil
NN
Pavers required
AA
Paved area
pLp_L
Paver length including its joint
pWp_W
Paver width including its joint
ww
Wastage allowance (decimal)

How the paver calculator works

Pavers are counted by dividing the area to be paved by the face of one paver, then adding a share for the pieces you cut and the ones that break. The sum is area ÷ (length × width) × (1 + wastage), rounded up to a whole paver. With the US defaults, 215 ft² of 18 × 18 in pavers (2.25 ft² each) comes to 95.6 pavers before cutting, 106 with 10% added, $477 at $4.50 each; the metric defaults, 20 m² of 450 × 450 mm slabs (0.2025 m² each, 4.94 to the square metre), come to 98.8 before cutting and 109 with the allowance, £490.50. The result shows the count to cover the area exactly, the extra the wastage adds, and the pavers per square metre or square foot, which is the number suppliers print on the pack.

The one thing to get right is what "paver size" means. The calculator divides by whatever you enter, so if you enter the slab itself and the slabs are laid with a joint, you will buy more than you need: a 450 mm slab with a 10 mm joint covers a 460 mm module, 4.73 to the square metre rather than 4.94, and over 20 m² that is 104 slabs with wastage instead of 109. Marshalls, the UK's largest paving maker, recommends a 10 mm joint for its slab ranges and states that its sizes and coverage "are actual and do not include joint width", so a supplier's per-square-metre figure may or may not carry the joint: check which. Concrete block pavers and most porcelain are different: the blocks carry spacer nibs that set a 2 to 5 mm joint when laid hand-tight (the figure in Marshalls' block paving installation guidelines and in highway standard drawings for 400 × 400 mm modular pavers), and are counted by their nominal module. An 18 in US paver laid with a 3/8 in joint is an 18.375 in module, 101 pavers for the default patio instead of 106.

Wastage, cuts and patterns

The 10% default is this calculator's planning allowance, not a manufacturer's figure; Marshalls' technical guidance says to make an allowance for cutting and wastage without putting a number on it, because the figure that fits depends on the shape of the area and the pattern. A square patio laid in a straight stack or stretcher bond with large slabs cuts only along two edges, and 5% covers it. Curves, circles, diagonal laying and herringbone cut every edge piece twice and discard more of each, and 10 to 15% is realistic. Small blocks waste less by count because each cut throws away a smaller piece, but there are many more of them. Whatever the allowance, Marshalls' installation guidelines have the whole units laid first and the cut units last, around obstacles and at edges, with no cut block smaller than a quarter of a unit, because small slivers do not stay put. Breakages in transit and the odd slab with a chipped corner come out of the same allowance, and so does a spare or two for the future.

What this tool does not do

It counts the pavers. It does not calculate the sub-base, the bedding sand or mortar, the jointing compound, the edge restraints or the geotextile, each of which is a separate quantity (the gravel and sand calculators cover the first two), and it does not know the laying pattern, so a herringbone or a circle feature gets the same arithmetic as a plain grid. It does not take off the area of a drain cover, a manhole or a planting bed inside the patio unless you leave them out of the area, and it assumes one paver size; a mixed-size "patio pack" is counted in packs by its stated coverage, not here.

On-site considerations for paver

Measure the finished area, not the excavation, and add the border course if there is one. Set out the first full row from a straight edge and work whole units in from there so the cuts fall at the far edge and against walls; dry-lay a row across the width first to see whether a joint change avoids a sliver. Keep the joints consistent with spacers or packers, because a joint that drifts from 10 to 15 mm over a run of ten slabs moves the last slab 50 mm and changes the cut. Mix slabs from several packs as you lay them so colour variation spreads evenly rather than banding. A slab laid on a full bed of mortar or on compacted sand with the right falls (about 1 in 60, 17 mm per metre, away from the house in UK practice) will not rock; one laid on five dabs will.

Codes and compliance

Paving itself is rarely regulated, but drainage from it often is. In England, paving over 5 m² of front garden with an impermeable surface that drains to the road needs planning permission unless the water is directed to a lawn or a permeable area; permeable block paving to BS 7533-103 avoids the question. Many US municipalities count paving towards an impervious-cover limit that triggers stormwater requirements, and Australian councils and Canadian municipalities have similar rules. Paving against a house must sit at least 150 mm (6 in) below the damp-proof course or weep holes in the UK and Australia, and below the siding or weeps in North America, or the wall gets wet.

Before you order

Confirm the pack coverage and whether it includes the joint, then compare the pack count with the calculator's: pavers come in packs of a fixed number or area, and a pack that covers 9.5 m² does not round neatly into 20 m². The edge or border units go on the order as a separate line if the pattern uses them, with the cutting blade and the jointing compound alongside. Check the delivered colour against the sample before the pallets are split, since a batch that does not match goes back whole or not at all.

Adjusting the defaults

Every input is editable and the result updates as you type. The area is the finished paved area in m² or ft², the paver size is the laying module in millimetres or inches, the wastage runs from 0 to 30%, and the price is per paver from your supplier (a pack price divided by its count). The unit switch above the inputs converts the defaults between a 450 mm slab and an 18 in paver; for a pattern that mixes two sizes, run each size on its share of the area and add.

Using this paver calculator alongside other BuildMetricLab tools

The gravel calculator sizes the compacted sub-base under the patio, the sand calculator the bedding layer the pavers sit on, and the fence calculator the boundary beside it. Every BuildMetricLab tool runs entirely in your browser, nothing you type is sent anywhere, and the formula is shown on the page so the maths can be audited.

Sources & methodology

Pavers = ⌈area ÷ (paver length × paver width) × (1 + wastage)⌉, with the size entered as the laying module (the unit plus its joint): Marshalls recommends a 10 mm joint for its slab ranges and quotes sizes and coverage as actual, excluding the joint, so a 450 mm slab with a 10 mm joint is entered as 460 × 460 mm (4.73 per m² rather than 4.94); concrete block pavers carry spacer nibs giving a 2 to 5 mm joint (Marshalls Concrete Block Paving Installation Guidelines; Hertfordshire highway standard drawing for 400 × 400 mm modular pavers) and are entered at nominal size. The count before wastage is the area ÷ module area rounded up; the wastage allowance is applied to the unrounded count and the total rounded up once; the default 10% is this calculator's planning figure (Marshalls' guidance asks for a cutting and wastage allowance without a percentage); cost = pavers × price. Imperial inputs are converted at 0.09290304 m² per ft² and 25.4 mm per inch before the calculation. Sub-base, bedding, jointing material and edge restraints are not included.

Frequently asked questions

Are paver calculator results accurate enough to order materials?

Yes, provided the size you enter is the laying module, the paver plus its joint: area ÷ module area is exact for a straight layout, and the wastage covers the cuts and breakages. Enter a 450 mm slab laid with a 10 mm joint as 460 × 460, and an 18 in paver with a 3/8 in joint as 18.375 in; block pavers with spacer nibs are entered at their nominal size. Then round up to the supplier's pack, since pavers come in packs of a fixed count or area, and keep a spare or two.

What wastage percentage should I use?

The 10% default is a planning allowance of this calculator's own; Marshalls' technical guidance tells you to make an allowance for cutting and wastage without fixing a figure. About 5% suits a square or rectangular area laid straight with large slabs, where only two edges are cut; 10 to 15% suits curves, circles, diagonal laying and herringbone, where every edge piece is cut and more of each cut is discarded. Breakages in transit and a chipped corner or two come out of the same allowance.

Does this replace professional advice?

No. It counts pavers for an area. The sub-base, bedding, falls, edge restraints and drainage decide whether the patio stays flat and dry, and in many places the drainage is regulated: in England, more than 5 m² of impermeable paving to the front of a house that drains to the road needs planning permission, many US municipalities count paving towards an impervious-cover limit, and Australian and Canadian councils have similar rules. Paving near a house also has to sit below the damp-proof course or the weep holes. An installer or landscape designer sees those; this tool does not.

Can I change the unit prices?

Yes. The price per paver is editable and the cost line is simply the rounded-up paver count multiplied by it, in the page currency. Divide a pack price by the pack count to get the figure. The total is for the pavers only; the sub-base, bedding sand or mortar, jointing compound, edging and labour are separate, and the gravel and sand calculators cover the first two.