Concrete Driveway Calculator
Concrete volume, order quantity, sub-base and cost for a poured driveway, in metric or US units
Updated October 8, 2026 · Live
What this tool does
Works out the ready-mix concrete a poured driveway needs from its length, width and slab thickness, adds a wastage allowance, rounds the order to a quarter cubic metre or cubic yard and prices it at your supplier's rate. It also gives the sub-base volume and weight, the delivered weight of the concrete, a control joint spacing guide and a thickness check.
Length times width times thickness gives the slab volume; a wastage allowance sizes the order; the sub-base depth gives the Type 1 to buy.
People also use
Formula Used
Formula Used
How the concrete driveway calculator works
A driveway slab is a box: length times width times thickness. The calculator takes those three measurements, adds the wastage allowance you set and shows the volume to order in cubic metres or cubic yards, whichever side of the unit switch you are on. An 8 m by 3 m drive at 150 mm is 24 m² and 3.60 m³ of concrete, 3.78 m³ with 5% wastage. The same sum in US units, 40 ft by 12 ft at 6 in, is 480 ft², which is 240 ft³, which divided by 27 is 8.89 yd³, and 9.33 yd³ with the allowance.
Ready-mix is sold by volume, and the National Ready Mixed Concrete Association suggests ordering 4% to 10% more than the figure from the plan dimensions. The default 5% sits at the bottom of that range because a drive is a simple shape on a base that can be levelled. Push it up for a hand-barrowed pour, a base left rough, or edges dug wider than the formwork. Suppliers usually take part loads in quarter cubic metres or quarter cubic yards, so the order row rounds up to that step: 3.78 m³ becomes an order for 4.00 m³, and 9.33 yd³ becomes 9.50 yd³. The cost row prices the volume with wastage at the rate you enter, so a £135 per m³ quote gives £510.30 for the 8 by 3 drive and $180 per yd³ gives $1,680 for the 40 by 12 one. It includes nothing for the sub-base, mesh, formwork or labour.
The levels under the slab are where most driveway orders go wrong. Heidelberg Materials' guide to laying a concrete base makes the point with one figure: a base finished 1 cm low over 25 m² adds a quarter of a cubic metre, over half a tonne, to the pour. Measure the finished sub-base in a few places before phoning the order, not the drawing.
Slab thickness and what goes under it
In the UK, 100 mm is the floor for a drive. Pavingexpert puts drives, garage bases and hardstandings at a minimum of 100 mm, with 150 to 200 mm for heavier use such as large vans, on a mix of at least C20. Heidelberg Materials says the same: driveways and garages need at least 100 mm. In the US, 4 in is the common residential figure and 6 in suits heavier vehicles; the ACI 332 residential concrete code covers slabs on ground for houses, and the mix, air entrainment and thickness for your climate come from it or from the local code. The thickness check reads those limits back: under 100 mm (4 in) it flags the slab as thin for a car drive, between 100 and 150 mm it notes that 150 mm (6 in) suits vans, and at 150 mm or more it says so. The default is 150 mm (6 in) because a drive that only ever carries a hatchback still has to take the removals lorry once.
Under the slab goes a compacted granular sub-base. In the UK that is usually MOT Type 1, the crushed rock graded to Clause 803 of the Specification for Highway Works, laid 100 to 150 mm thick and compacted in layers; Heidelberg's guide shows 100 mm of sub-base and a damp-proof membrane under a domestic base, and firm undisturbed ground needs less than filled or soft ground. The sub-base rows give the compacted volume from the depth you enter and its weight at about 2 tonnes per cubic metre, the figure merchants quote for Type 1. For the 8 by 3 drive at 150 mm that is 3.60 m³ and 7.2 tonnes, about nine 850 kg bulk bags; the US default, 6 in under 480 ft², is 8.89 yd³ and just under 15 US tons. Crushed stone elsewhere varies, so the weight is a check figure to put against the supplier's own coverage chart.
Joints, mesh and the 1.5 rule
Concrete shrinks as it dries and cracks where it likes unless it is told where to. NRMCA's guide to joints in slabs on grade sets the maximum joint spacing at 24 to 36 times the slab thickness, about 10 ft (3 m) for a 4 in (100 mm) slab, with 15 ft (4.5 m) as an outer limit whatever the thickness, and asks for panels that are square or nearly so, no longer than 1.5 times their width. The joint spacing row applies that rule: 150 mm gives 3.6 to 4.5 m and 6 in gives 12 to 15 ft. On the 8 m drive that means one joint across the middle, leaving two panels of 4 m by 3 m; on the 40 ft one, two joints at a third and two thirds leave three panels of 13.3 ft by 12 ft. A contraction joint is grooved or cut to at least a quarter of the slab depth and never less than 25 mm (1 in), and a saw cut goes in within 4 to 12 hours of finishing. The calculator does not count the mesh or fibre that often goes in a domestic drive; the rebar calculator handles that.
Rainwater, and the planning rules in England
A concrete drive is impermeable, and in England that brings planning law in before the building regulations. The Planning Portal explains the rule that has applied since October 2008: a new or replacement front drive of more than 5 m² needs planning permission if it is laid in a traditional impermeable material and the rain runs off it to the road, but not if the surface is permeable or the rainwater is directed to a lawn or border within the property. The government's guidance on permeable surfacing of front gardens sets out the options: permeable paving, a gravel strip, or a fall that sends the water to a soakaway or planted area. Wales has its own policy, and Scotland and Northern Ireland their own planning systems. Outside the UK, stormwater rules for driveways sit with the municipality or council, and a new driveway approach onto a public road often needs a permit of its own. The pattern is the same everywhere: water off the drive stays on the plot or goes to a drain, not onto the highway or the neighbour.
Where the drive is a paved access route to the house, Approved Document H of the England building regulations applies too. Its requirement H3 lists where rainwater goes in order of priority: a soakaway or other infiltration system first, a watercourse where that is not reasonably practicable, and a sewer last. A linear channel at the garage door connected to a soakaway meets the planning rule and the building rule at once, and the permeable paver calculator sizes the alternative where permission for a solid slab is unlikely.
Ordering the concrete
Ready-mix is made to a specification, and ordering it means naming the strength, the maximum aggregate size and the slump, and in a cold climate the air content; NRMCA's ordering guide walks through each. A truck mixer carries about 5 to 9 m³ (8 to 12 yd³), so the 8 by 3 drive is one load and the 40 by 12 one is one full load or two part loads; the ready-mix truck calculator splits a larger pour into deliveries. Part loads carry a charge below the supplier's minimum, so a small pad is sometimes cheaper from bags. Running short mid-pour leaves a cold joint across the drive, which is why the order rounds up and not down. The delivered weight row, at 2,400 kg/m³ (150 lb/ft³), the top of NRMCA's normal-weight range of 2,240 to 2,400 kg/m³, is there for the access and the wheelbarrow count: 3.78 m³ is 9.07 tonnes of wet concrete, and a mixer that cannot reach the drive turns into a long afternoon with barrows.
What the calculator leaves out
It assumes a rectangle. An L-shaped or splayed drive is two rectangles; run each and add the order quantities, or use the concrete slab calculator for the odd piece. It does not price the dig, the skip, the sub-base, the membrane, the mesh, the formwork, the finish or the labour; the driveway cost calculator compares whole-drive costs across surfaces. It does not check the ground: a drive on soft clay, made ground or over a cellar, a sewer or tree roots is a question for a surveyor or engineer, and so is any drive that will carry commercial vehicles. And the joint spacing is a maximum, not a design; the panel layout, the joint depth and any dowels across a joint that carries wheel loads follow the local standard and the contractor's judgement.
Using this with other BuildMetricLab tools
If the planning rule or the price rules out a solid slab, the block paver calculator and the asphalt calculator quantify the two usual alternatives for the same drive, and the sub-base row carries straight over since all three sit on the same Type 1. Save the concrete and sub-base lines to My Project to add them to the rest of the job, or send them to PlainEstimate from the result card. All BuildMetricLab tools run in your browser with no sign-up, and the formula is on the page so the maths can be checked.
Sources & methodology
V = L × W × t, with t in metres (mm ÷ 1000) on the metric side and in feet (in ÷ 12) on the US side, where the result is divided by 27 for cubic yards. Volume to order = V × (1 + wastage %); the order row rounds that up to the next 0.25 m³ or 0.25 yd³. Sub-base = L × W × depth, weighed at 2.0 t/m³ (125 lb/ft³), the figure merchants quote for MOT Type 1. Concrete is weighed at 2,400 kg/m³ (150 lb/ft³), the top of NRMCA's 2,240 to 2,400 kg/m³ normal-weight range. Cost = volume with wastage × price. Control joint spacing = 24 to 36 × thickness, capped at 4.5 m (15 ft), per NRMCA CIP 6. The thickness check compares the slab with 100 mm (4 in), the usual minimum for a car drive, and 150 mm (6 in) for vans and heavier vehicles.
- NRMCA, CIP 31: Ordering Ready Mixed Concrete (sold by volume; truck mixers 8 to 12 yd³, 5 to 9 m³; order 4% to 10% over the plan quantity)
- NRMCA, CIP 6: Joints in Concrete Slabs on Grade (spacing 24 to 36 × thickness, 15 ft / 4.5 m maximum; panels no longer than 1.5 × width; groove at least ¼ depth and 1 in)
- NRMCA, CIP 36: Structural Lightweight Concrete (normal-weight concrete 140 to 150 lb/ft³, 2,240 to 2,400 kg/m³)
- Pavingexpert: Plain Concrete Hardstandings (drives at least 100 mm, 150 to 200 mm for large vans, C20 minimum)
- Heidelberg Materials UK: How to lay a concrete base (driveways at least 100 mm; 100 mm sub-base and DPM; 1 cm over 25 m² is ¼ m³)
- National Highways, Manual of Contract Documents for Highway Works, Volume 1, Series 800, Clause 803: Type 1 unbound mixtures (November 2021 amendment)
- Mainland Aggregates: MOT Type 1 Sub Base (about 2 tonnes per m³; 850 kg bulk bag covers about 5 m² at 100 mm)
- Planning Portal (England): Paving your front garden (the 5 m² rule for impermeable surfaces)
- GOV.UK: Permeable surfacing of front gardens, guidance (MHCLG, 2009 revision)
- GOV.UK: Approved Document H, Drainage and waste disposal (requirement H3, rainwater drainage of paved areas, order of priority)
- ACI CODE-332-20: Code Requirements for Residential Concrete and Commentary (slabs on ground)
Frequently asked questions
Are concrete driveway calculator results accurate enough to order materials?
For a rectangular slab the geometry is exact; what moves the figure is the dig. A sub-base finished 10 mm low over 24 m² takes another 0.24 m³, so measure the finished levels in a few places before ordering. The 5% default wastage covers a well-prepared base, and NRMCA suggests 4% to 10% over the plan quantity; the order row then rounds up to the quarter cubic metre or cubic yard suppliers deliver in. Confirm the final volume and mix with the supplier.
What wastage percentage should I use?
5% by default, the low end of the 4% to 10% range NRMCA gives for ordering over the plan quantity. Raise it for a hand-barrowed pour, a rough base or an irregular shape; set it to 0 to see the bare slab volume. The allowance applies to the concrete only: the sub-base rows give the compacted volume and weight for the depth entered.
Is this a substitute for professional advice?
No. It sizes a plain rectangular slab. A drive on soft clay, made ground or over a cellar, sewer or tree roots, one that will carry commercial vehicles, or any work that affects structure, drainage to a public sewer, gas or electrics, needs a suitably qualified professional. In England a new impermeable front drive over 5 m² needs planning permission unless the rainwater is kept on the plot.
Can I change the unit prices?
Yes. The price per m³ or per yd³ is the delivered ready-mix rate from a quote, and the cost is the volume with wastage times that rate. It includes nothing for the sub-base, membrane, mesh, formwork or labour; enter 0 to see quantities only.