Concrete & Foundations
Ready-Mix Truck Volume Calculator
Ready-mix trucks, last-load size and concrete cost from the pour volume
Updated May 13, 2026 · Live
What this tool does
Estimates how many ready-mix trucks a pour needs from its volume and the truck capacity, how full the last truck is, and the concrete cost.
Estimates the number of ready-mix trucks for a pour, how full the last truck is, and the concrete cost, from the pour volume and truck capacity.
People also use
Formula Used
Formula Used
How the ready-mix truck volume calculator works
Ready-mix concrete is ordered by volume and delivered in trucks of a set capacity, so the number of trucks is the pour volume divided by the truck capacity, rounded up. This calculator takes the pour volume and the capacity of your truck, gives the truck count, shows how full the last truck is and prices the concrete. The formula is N = ⌈V ÷ C⌉, and the cost is V × p for a price p per cubic yard. The page works in cubic yards and converts internally, so the metric and US-unit versions agree.
Example with the defaults on this page: a 25 yd³ pour with 10 yd³ trucks needs 25 ÷ 10 = 2.5, which rounds up to 3 trucks. The first two carry 10 yd³ each and the third carries the last 5 yd³, which is half a load. The spare capacity across the three trucks is 3 × 10 − 25 = 5 yd³. At $185 a cubic yard the concrete costs 25 × 185 = $4,625. In metric, 25 yd³ is 19.1 m³ and a 10 yd³ truck is 7.6 m³.
Working out the volume first helps. A 30 × 40 ft slab 4 in thick is 30 × 40 × (4 ÷ 12) = 400 ft³, which is 14.8 yd³. With 10% extra for uneven ground that is 16.3 yd³, so 2 trucks, the second carrying 6.3 yd³. A 30 yd³ pour fills exactly 3 trucks of 10 yd³, but in practice a supplier may send a truck a little short of full.
Typical US concrete and foundations wastage
The tool adds no allowance, so enter a pour volume that already includes the margin. Concrete is placed into forms and ground that are never exactly the planned shape. Excavations are a little over, forms bow under the weight, and some concrete is spilled or left in the chute, so many contractors add 5 to 10% to the measured volume. That is a trade habit and not a published standard. Ordering a little over is cheaper than a second delivery, and ordering short stops the pour with a cold joint.
A short last truck is common. In the first example the third truck carries only half a load, and some suppliers charge extra for a part load. Ask what the minimum load is and whether a short-load charge applies. Rounding the volume so that the last truck is nearly full can save money, but only if the extra concrete has somewhere useful to go, such as a path or a pad.
What this tool does not do
It does not work out the pour volume from the dimensions, so use the concrete volume calculators first. It does not choose the mix, the strength, the slump or the admixtures. It does not model the pump, the delivery timing or the travel distance, and it does not include short-load, delay, fuel or pump charges. Truck capacities differ by supplier and by road weight limits, so the capacity is yours to enter. It is a first estimate and not an order.
On-site considerations for ready-mix truck volume
The supplier decides how many trucks to send, and you order the volume. Typical trucks carry up to about 10 yd³, but smaller trucks and volumetric mixers exist for small pours, and the weight of a full truck limits access. Check that a loaded truck, which is very heavy, can reach the pour without damaging a driveway, drain cover or kerb. Have the forms, reinforcement and crew ready before the first truck arrives, because concrete starts to set from the moment it is mixed.
Time matters. ASTM C94 sets limits on how long concrete may be in the truck, commonly cited as about 90 minutes or 300 drum revolutions, and the batch ticket records the time of first mixing. Plan the pour so that each truck is placed in good time, with a pump or a barrow gang that keeps up. Plan where the truck's chute will be washed out, because washout water is alkaline and must not go to a drain or watercourse.
Codes and compliance
In the United States, ASTM C94 covers ready-mixed concrete and the batch ticket, and the American Concrete Institute and the National Ready Mixed Concrete Association publish practice guidance. Structural concrete, such as foundations, retaining walls and suspended slabs, is regulated work that needs a design and often an inspection before the pour. Wet concrete is alkaline and burns skin and eyes. HSE warns that cement can cause serious skin problems such as dermatitis and burns, so wear gloves, boots and eye protection, and wash splashes off at once. Other countries have their own rules, so follow the ones where you build.
Before you order
Work out the pour volume from the dimensions and add your margin. Tell the supplier the volume, the mix or strength class, the placement method, the access and the time you want the first truck. Ask about the truck sizes, the minimum load, short-load and delay charges, and whether a pump is needed. Compare the delivered price per cubic yard, not the price per truck. Check the batch ticket on each delivery against your order, and refuse a load that has waited too long.
Adjusting the defaults
Every input is editable. The volume and the truck capacity must be above zero, and the price zero or more. A blank or zero field is refused instead of silently using a default, and a blank price hides the cost line. If your supplier uses trucks of different sizes, run the tool for each capacity and compare the number of trucks and the size of the last load.
Using this ready-mix truck volume calculator alongside other BuildMetricLab tools
Pair this estimate with the concrete slab, footing and wall calculators for the pour volume, and with the water-cement ratio calculator for the mix. All BuildMetricLab tools run in your browser. Nothing you type is sent anywhere, and every formula is shown on the page so you can audit the maths.
Sources & methodology
Trucks = pour volume ÷ truck capacity, rounded up to a whole truck. The last truck carries the volume minus the full loads before it, shown as a share of a full load, and the spare capacity is the empty space across all trucks. The page takes volume and capacity in yd³ (1 yd³ = 0.7646 m³) and the price per yd³. Cost = volume × price per unit volume, hidden if no price is entered. Concrete is billed for the volume ordered and delivered, so the cost does not include the empty space in the last truck, and short-load, delay, pump and fuel charges are separate and not modelled. The volume and capacity must be above zero and the price zero or more. Truck capacities vary by supplier and by road weight limits, so the capacity is yours to enter. The tool does not add a wastage allowance; the pour volume should include any margin for uneven ground and spillage.
- NRMCA — National Ready Mixed Concrete Association: ordering and delivery of ready-mixed concrete (US)
- ACI — American Concrete Institute: concrete specifications and practice (US)
- ASTM C94 — Specification for ready-mixed concrete: batch tickets, volume and discharge time limits (US)
- NIST — Special Publication 811, Guide for the Use of the International System of Units (yd³ and m³)
Frequently asked questions
Are ready-mix truck volume calculator results accurate enough to order materials?
They are a good first check on how many trucks a pour needs. The truck count follows from the volume you enter, so it is only as good as that volume. You normally order concrete by the cubic yard and the supplier decides the trucks. Confirm the volume, the mix and the delivery with your supplier, and ask about short-load charges.
Should I add extra volume for spillage or over-excavation?
The tool adds no allowance, so enter your pour volume including the margin. Many contractors add 5 to 10% for uneven ground, formwork that bows, and spillage. That is a trade habit and not a published standard. For the default 25 yd³, 10% extra is 27.5 yd³, which still needs 3 trucks of 10 yd³.
Does this tool provide a substitute for professional advice?
No. It estimates a truck count and a cost only. It does not choose the mix, the slump, the pump or the pour sequence. For structural concrete, slabs on poor ground, or anything with reinforcement or a code requirement, consult a licensed contractor or engineer and your concrete supplier.
Can I change the unit prices?
Yes. The price per cubic yard is editable, and a blank price hides the cost line. A price of zero is accepted. The cost is the volume ordered times the price, which is how suppliers bill, so it does not include a charge for the empty space in the last truck. Short-load, delay, pump and fuel charges are separate.
Spotted something off?
Calculations or display — let us know.
Related tools
Calculators from other categories that planners often reach for next.