Concrete & Foundations
Rebar / Reinforcement Calculator
Rebar length, weight, stock bars and cost for a slab or footing grid
Updated May 13, 2026 · Live
What this tool does
Estimates the length, weight, number of stock bars and cost of rebar for a square or rectangular grid in a slab or footing, from its size, bar size and spacing.
Estimates the number of bars, the total length, the weight and the cost of rebar for a slab or footing grid with the same spacing both ways.
People also use
Formula Used
Formula Used
How the rebar / reinforcement calculator works
Reinforcement bar in a slab or footing is laid as a grid, with bars running in two directions. This calculator counts the bars in each direction from the spacing, works out their total length, adds an allowance for laps and weighs the steel from the bar diameter. The count in each direction is ⌈span ÷ spacing⌉ + 1, and the mass is the length times π × (d ÷ 2)² times the density of steel, 7,850 kg/m³ (490 lb/ft³). The page works in feet, inches and pounds and converts internally, so the metric and US-unit versions of the same slab agree.
Example with the defaults on this page: a slab 16 ft by 13 ft with #4 (0.5 in) bars at 12 in centres each way. Bars running along the 16 ft length are spaced across the 13 ft width, so there are ⌈13 ÷ 1⌉ + 1 = 14 of them, 224 ft in all. Bars running across the 13 ft width are spaced along the 16 ft length, so there are ⌈16 ÷ 1⌉ + 1 = 17, which is 221 ft. The grid is 445 ft, and with the 15% allowance it is 511.7 ft. A #4 bar weighs 0.668 lb/ft, so the rebar weighs about 342 lb (155 kg). In 20 ft stock bars that is 26 bars, and at $0.55 a lb the cost is about $188.
Bar size changes the weight a lot, because weight goes with the square of the diameter. The same grid in #3 bars (0.375 in, 0.376 lb/ft) weighs about 192 lb, and in #5 bars (0.625 in, 1.043 lb/ft) about 534 lb. Nominal weights are #3 0.376, #4 0.668, #5 1.043 and #6 1.502 lb/ft. In metric, a 12.7 mm bar weighs 0.994 kg/m.
Typical US concrete and foundations wastage
The tool has a lap allowance and no separate wastage figure. The 15% default covers the overlaps where one bar meets the next end to end, and some offcuts. It is a planning number and not a design lap. Real laps are set by the design and are often 40 to 60 bar diameters, so a 0.5 in bar laps about 20 to 30 in. On a 12 m bar that is about 4 to 6% of the length, so 15% is generous for long bars and tight for short ones.
The grid also runs bar to bar across the whole slab with no cover deducted, so the real bars stop short of the edges by the concrete cover and there is usually one bar fewer each way. That makes the tool's count a little high, which is the safer side for an order. For an order, use the engineer's bar schedule, which lists each bar's shape, length and number.
What this tool does not do
It does not choose the bar size, the spacing, the cover or the laps, which come from the design. It assumes the same bar and spacing both ways in a single layer. It does not count hooks, bent bars, extra bars at corners, openings and edges, or the chairs and spacers that hold the grid in position, and it does not size mesh or fibre reinforcement. It is a first estimate of the steel and not a bar schedule.
On-site considerations for rebar / reinforcement
Position matters as much as quantity. Reinforcement works only if it sits where the design puts it, with the right cover of concrete over it. Support the grid on chairs or spacers so it does not sink to the bottom of the pour, and tie the bars at intersections so they do not shift. Keep the bars clean of loose rust, oil and mud. Check the cover with a gauge before the pour, because bars that are too close to the surface rust and crack the concrete.
In the United States, ACI 318 sets the requirements for structural concrete, including cover, laps and development lengths, and CRSI publishes bar data and detailing guidance. A slab on grade often uses lighter reinforcement than a footing, and the design decides. Bars are sold in stock lengths, so plan the laps to use them well, and cut the bars with a proper cutter or saw. Cut and protruding bars are a hazard to anyone who falls on them, so cap or bend over exposed ends, and wear gloves and eye protection.
Codes and compliance
Reinforced concrete is structural work, and in most places a foundation or a suspended slab needs a design, a permit or approval, and an inspection of the steel before the pour. The reinforcement must match the drawings. Wet concrete is alkaline and burns skin and eyes. HSE warns that cement can cause serious skin problems such as dermatitis and burns, so wear gloves, boots and eye protection. Other countries have their own rules, so follow the ones where you build.
Before you order
Get the bar schedule from the engineer or the drawings, with the sizes, shapes and lengths. Check the grade of steel and that the bar carries the mark of a recognised standard. Compare the price per lb, and ask about stock lengths, cutting and bending and delivery. Order a little extra for offcuts and for corner bars, and keep the bars off the ground and dry on site. Order chairs, spacers and tie wire at the same time, so that the grid can be set and checked before the concrete arrives.
Adjusting the defaults
Every input is editable. The slab length and width, the bar spacing and the bar diameter must be above zero, the spacing must be larger than the bar, and the lap zero or more. A blank or zero field is refused instead of silently using a default, and a blank price hides the cost line. For two layers of reinforcement, run the tool twice and add the results. For a slab with different spacing each way, run it for each direction using the other spacing.
Using this rebar / reinforcement calculator alongside other BuildMetricLab tools
Pair this estimate with the concrete slab, footing and cement bag calculators for the concrete, and with the ready-mix truck calculator for delivery. All BuildMetricLab tools run in your browser. Nothing you type is sent anywhere, and every formula is shown on the page so you can audit the maths.
Sources & methodology
Bars in one direction = ⌈spacing-direction span ÷ spacing⌉ + 1, and the same in the other, so a slab 4 m wide at 200 mm needs 21 bars across it. Total length = Σ (bars × the span they run along), then × (1 + lap ÷ 100). Mass = length × π × (d ÷ 2)² × 7,850 kg/m³ (490 lb/ft³ for steel), which gives 0.888 kg/m for a 12 mm bar and 0.668 lb/ft (0.994 kg/m) for a #4 bar, matching the tabulated nominal weights. The page takes ft and inches and gives lb (1 ft = 0.3048 m; 1 lb = 0.4536 kg). Stock bars are the total length ÷ 12 m (20 ft on the US page, 6.1 m), rounded up. Cost = mass × price, hidden if no price is entered. The length, width, spacing and bar diameter must be above zero, the spacing larger than the bar, and the lap zero or more. The grid runs bar to bar across the whole slab with no cover deducted, so the count and length are slightly high. The lap is a flat planning figure, not a design lap length, and the tool does not model hooks, chairs, extra corner bars or a bar schedule.
Frequently asked questions
Are rebar / reinforcement calculator results accurate enough to order materials?
They are a good first quantity for a simple grid. The tool counts bars bar to bar across the whole slab, so it ignores the concrete cover at the edges and gives slightly more than a detailed bar schedule. Laps, hooks, chairs and extra bars at corners and openings come from the design. Ask your supplier or the engineer for the bar schedule before you order.
What wastage percentage should I use?
The tool has a lap allowance and no separate wastage figure. The default 15% covers the overlaps where bars meet end to end and some offcuts, and it is a planning figure and not a design lap. Real laps are often 40 to 60 bar diameters, so a 0.5 in bar laps about 20 to 30 in, and the allowance depends on how long the bars are. Use your engineer's laps for an order.
Does this replace professional advice?
No. It estimates rebar quantity and cost only. It does not choose the bar size, spacing, cover or laps, or check that the slab is adequate. Reinforcement is structural, so follow the design, and consult a licensed contractor or engineer for foundations, suspended slabs or anything that carries load.
Can I change the unit prices?
Yes. The price per pound is editable, and a blank price hides the cost line so only the quantity shows. A price of zero is accepted. The slab length and width, the bar spacing and the bar diameter must be above zero, the spacing must be larger than the bar, and the lap must be zero or more.
Spotted something off?
Calculations or display — let us know.