Masonry & Brickwork
Repointing Mortar Calculator
Estimates repointing mortar for brick joints from the wall area
Updated October 14, 2026 · Live
What this tool does
Estimates the mortar needed to repoint a brick wall from its face area: joint length for a standard brick format, joints raked to twice their width, and bagged mortar density give the mass, volume, bag count and cost at your price.
Enter the wall area and the mortar price; the calculator returns the mortar mass to repoint the joints, the joint length, the volume, the bag count and the cost, assuming a standard brick format and joints raked to twice their width.
People also use
Formula Used
Formula Used
How the repointing mortar calculator works
Repointing replaces only the outer part of each joint, so the mortar you need is the length of joint in the wall times the width of the joint times the depth you rake it out to, turned into a mass with the density of wet mortar. The calculator does that sum from the wall area alone by assuming the brick format of your unit system. A UK metric wall of 215 × 65 mm bricks with 10 mm joints has sixty bricks and 13.3 courses to the square metre, which is 13.3 m of bed joint and 3.9 m of perpends, 17.2 m of joint per m²; a US wall of modular brick (7 5/8 × 2 1/4 in with 3/8 in joints, three courses to 8 in) has 4.5 ft of bed joint and 1.3 ft of head joint per ft², 5.77 ft in all. Raked out to twice the joint width, 20 mm or 3/4 in, which is the minimum the Brick Industry Association gives in Technical Note 46 and its repointing brief, that joint holds 3.4 litres of mortar per m², and at 1,810 kg/m³ (the density behind Quikrete's stated yield of 20 L from a 36.2 kg bag) it weighs 6.2 kg per m², or 1.27 lb per ft². The default 10 m² therefore needs 62 kg, three 25 kg bags, and 108 ft² needs 137 lb, two 80 lb bags. The cost line is that mass times the price per kilogram or pound you enter, and the result also shows the joint length, the volume and the bag count.
Joint depth, brick format and waste
Depth is the figure that moves the answer, because the volume is proportional to it. Twice the joint width is a minimum: Technical Note 46 says to cut back "generally 3/4 in (19 mm), or until sound mortar is reached", and on a soft old wall sound mortar may be 25 or 30 mm in, which raises the quantity by a quarter or a half. Older and larger bricks move it the other way, since fewer joints per square metre means less mortar: a wall of 73 mm bricks has about 12 courses to the metre instead of 13.3. Stone and rubble walls with wide, irregular joints are a different sum altogether and this tool does not attempt them. Nothing is added for waste, and repointing wastes a lot of mortar: what drops off the hawk, what is mixed and not used before it stiffens, and what is cut out again because the joint was not clean. Buying a third more than the figure is normal practice, which is why the bag count is shown without an allowance for you to round up.
What this tool does not do
It estimates mortar by area for a brick wall of a standard format. It does not count joints from your actual brick, choose the mortar type, or tell you whether the wall needs repointing at all; Historic England's advice is that repointing a whole building is rarely necessary, and the BIA's is to cut out only what has failed. It does not price the raking-out, which is most of the labour, or the scaffold, and it does not model lime mortars, tuck pointing, ribbon joints or stone. The mix split in the materials hand-off, one part cement to five of sand by mass, is a planning quantity for a modern cement-lime mix and not a specification.
On-site considerations for repointing mortar
The mortar must be weaker than the brick. Repointing hard cement mortar into soft old brick or into a wall built with lime traps moisture and spalls the brick faces, so the Brick Industry Association recommends prehydrated Type N, O or K mortar for repointing, with Type N at one part Portland cement, one part hydrated lime and six parts sand, and Type O at one part cement to two of lime and nine of sand, by volume under ASTM C270; a wall built before the 1920s, or any listed building in the UK, usually wants a lime mortar matched to the original. Rake out with a chisel or a pointer's grinder on the bed joints only, since a grinder on the head joints damages the brick edges; wet the joint, then pack the mortar in layers of about 6 mm (1/4 in), letting each stiffen before the next, and tool the surface to match the existing profile. Fresh work needs a day sheltered from rain and any length of time from frost; below 5 °C (40 °F) the mortar needs cold-weather measures or a wait.
Codes and compliance
Repointing is maintenance and rarely needs a permit, but the rules about how it is done differ. In the US the Brick Industry Association's technical notes and ASTM E2260 (the standard guide for repointing historic masonry) set the practice, and the Secretary of the Interior's standards apply to work on historic buildings that is federally funded or tax-credited. In England and Wales, repointing a listed building with the wrong mortar is an unauthorised alteration, and conservation officers commonly require lime mortar and hand raking; in Australia and Canada heritage listings carry the same kind of condition. For an ordinary modern house anywhere, the manufacturer's data sheet for the mortar is the specification that matters.
Before you order
Measure the wall face and take off only large openings; the brick returns at window reveals are repointed too. Check the joint width and the brick size against the format assumed, and if a sample joint rakes out deeper than twice its width, scale the quantity up in proportion. The order is the bag count shown plus the waste you expect, or cement, lime and sand in the mix proportions for the type you have chosen, and every bag wants to be off the ground and dry. If the wall is historic, have a sample of the existing mortar analysed before buying anything.
Adjusting the defaults
The wall area and the mortar price are the two inputs and both are editable; the result updates as you type. The area is the face to be repointed in m² or ft², and the price is per kilogram or per pound of bagged mortar from your supplier (a 25 kg bag at £6 is 24p per kg; an 80 lb bag at $12 is 15¢ per lb). The unit switch above the inputs changes the brick format and the units of the result together: metric assumes the 215 × 65 mm brick and 25 kg bags, US units the modular brick and 80 lb bags.
Using this repointing mortar calculator alongside other BuildMetricLab tools
The net wall area calculator gives the face area with the openings taken off, the brick calculator counts the bricks and the mortar for new work rather than repointing, and the stone wall calculator covers rubble and dressed stone. Every BuildMetricLab tool runs entirely in your browser, nothing you type is sent anywhere, and the formula is shown on the page so the maths can be audited.
Sources & methodology
Mortar mass = joint length × joint width × raking depth × wet density × wall area. Joint length per unit of wall follows the brick format of the unit system: 215 × 65 mm bricks with 10 mm joints (60 per m², 75 mm courses) give 13.33 m of bed joint and 3.85 m of perpends per m², 17.19 m in all; modular brick (7 5/8 × 2 1/4 in, 3/8 in joints, three courses to 8 in) gives 4.50 ft of bed joint and 1.27 ft of head joint per ft², 5.77 ft in all. Raking depth is twice the joint width (20 mm, 3/4 in), the minimum in BIA Technical Note 46 (generally 3/4 in or 19 mm, or to sound mortar) and the BIA Brick Brief on repointing (equal to or exceeding two times the joint thickness). Wet density is 1,810 kg/m³ (113 lb/ft³), from Quikrete's veneer stone mortar yield of 20 L (0.71 ft³) per 36.2 kg (80 lb) bag. The result is 6.22 kg per m² on the metric side and 1.27 lb per ft² on the US side; bags are the mass divided by 25 kg or 80 lb, rounded up, with no waste allowance; cost is mass × the entered price. Imperial areas are converted at 0.09290304 m² per ft² and prices at 0.45359237 kg per lb before the calculation. The materials hand-off splits the mass one part cement to five parts sand by mass as a planning quantity; the mortar type and proportions (Type N 1:1:6, Type O 1:2:9 by volume under ASTM C270, per the BIA) are the specifier's choice.
- Brick Industry Association, Technical Note 46: Maintenance of Brick Masonry (repointing: remove mortar to a uniform depth of at least twice the joint width, generally 3/4 in (19 mm), or to sound mortar; prehydrated Type N, O or K mortar)
- Brick Industry Association, Brick Brief: Repointing (Tuckpointing) Brick Masonry (depth of removal equal to or exceeding two times the joint thickness; Type N 1:1:6 and Type O 1:2:9 proportions; prehydration)
- Quikrete, Veneer Stone Mortar technical data sheet (yield 0.53 ft³ (15 L) per 60 lb bag and 0.71 ft³ (20 L) per 80 lb bag, used for the wet density of bagged mortar)
- Brick Industry Association: Technical Notes on Brick Construction (index)
Frequently asked questions
Are repointing mortar calculator results accurate enough to order materials?
They are a planning quantity built from stated assumptions: a standard brick format (215 × 65 mm with 10 mm joints on the metric side, modular brick with 3/8 in joints on the US side), joints raked out to twice their width as the Brick Industry Association's minimum, and bagged mortar at 1,810 kg/m³ wet. That gives 6.2 kg per m² (1.27 lb per ft²). If a sample joint rakes deeper, or the bricks are a different size, scale the figure in proportion, and add a generous allowance for waste before ordering, because repointing drops and discards far more mortar than laying does.
What wastage percentage should I use?
None is built in, and the bag count is shown without one so you can see the bare figure. In practice a third extra is not unusual: mortar falls from the hawk, stiffens in the bucket before it is used, and is cut out again from joints that were not clean. A quarter to a third over the calculated mass is a reasonable order for a first job; an experienced pointer wastes less. There are no offcuts in the sense a tiler would mean, so the percentage is about handling, not cutting.
Does this replace professional advice?
No. It estimates a quantity for a sound modern brick wall. Whether the wall should be repointed at all, with what mortar (the BIA recommends prehydrated Type N, O or K for repointing, and an old or lime-built wall usually needs lime), and to what depth, are judgements for a mason or a conservation professional, and on a listed or heritage building the wrong mortar can be an unauthorised alteration in the UK and elsewhere. Structural cracking, bulging or damp behind the joints is a matter for a structural engineer or surveyor.
Can I change the unit prices?
Yes. The price per kilogram or per pound of mortar is editable and the cost line is simply the mass multiplied by it, in the page currency. Divide a bag price by its weight to get the figure (a 25 kg bag at £6 is 24p per kg; an 80 lb bag at $12 is 15¢ per lb); the total covers the mortar only, not the raking-out labour, the scaffold or the lime and sand if you mix your own.
Spotted something off?
Calculations or display — let us know.
Related tools
Calculators from other categories that planners often reach for next.













