Roofing Time Calculator
Estimates roofing labour hours, crew days and cost by roof area and crew size
Updated October 13, 2026 · Live
What this tool does
Estimates the labour hours, elapsed time, working days and labour cost to lay a roof covering from the roof surface area, a production rate in hours per square or per m², the crew size and the hourly rate, with Craftsman's published rates for shingles and tear-off.
Enter the roof surface area, the production rate, the crew size, the hourly rate and the working day; the calculator returns the person-hours, the elapsed hours for the crew, the working days and the labour cost.
People also use
Formula Used
Formula Used
How the roofing time calculator works
Roofing labour is estimated per square, the 100 ft² (9.29 m²) unit the trade has used for a century, so the calculator multiplies the roof surface by a production rate in hours per square (hours per m² on the metric side), divides the person-hours by the crew to get the elapsed hours, divides again by the productive hours in a day for the working days, and prices the person-hours at your hourly rate. The default rate is 1.83 hours per square (0.197 hr/m²), which is what the Craftsman National Construction Estimator 2026 allows one roofer to lay composition or asphalt shingles on a sheathed, straight gable roof of 6:12 pitch or less; the same table gives 1.25 for a built-up three-ply roof and 2.70 for 26-gauge steel. With the US defaults, 215 ft² (2.15 squares) takes 3.9 hours for one roofer, half a day, and $256 at $65 an hour. The metric defaults, 20 m² at 0.2 hr/m² and £32 an hour, come to 4.0 hours and £128. A 2,000 ft² roof, 20 squares, is 36.6 person-hours, which a crew of four lays in 9.1 hours, a long day, for $2,379.
Two things the rate does not contain. Tear-off is separate, and the Craftsman National Home Improvement Estimator 2026 prices it per square too: 1.33 hours to strip a single layer of asphalt shingles, 2.00 for two layers, 1.65 for clay or concrete tile, 1.79 for slate and 2.02 for wood shakes, with the debris carried to a bin on site. And the area is the roof surface, not the footprint: a 6:12 roof has 1.12 times the plan area under it, a 9:12 roof 1.25 times and a 12:12 roof 1.41 times, so a 1,500 ft² footprint under a 6:12 gable is 16.8 squares of shingles, not 15. The result shows both reminders.
Production rates for shingles, tiles and tear-off
Shingles are the fastest roof covering to lay and the one the default describes. Concrete interlocking tiles, common in the UK, Australia and parts of Europe, go down at roughly ten tiles per m² and plain clay tiles at around sixty, each nailed or clipped, with battens and underlay to fix first, so a tiled roof takes a multiple of the shingle rate; slate takes longer still, and metal sheet and standing seam sit between shingles and tile. There is no published labour constant for tiling in a free source we could verify, so the calculator does not guess one: set the rate from the roofer's quote, from your own last job, or from a priced estimating book, and the arithmetic does the rest. The rate also moves with the roof itself. Hips, valleys, dormers and penetrations add cutting and flashing that a straight gable does not have; a steep pitch slows every movement and adds staging; a second storey adds the carry. Craftsman's rate is a straight gable at 6:12 or less, which is the easy case.
What this tool does not do
It turns an area and a rate into hours, days and a labour cost. It does not include tear-off, underlay, battens, flashing, ridge and hip details, gutters or scaffold, each of which is its own line in a roofing quote, and it does not price materials, waste or the skip. It does not assess whether the deck can take the load or the fixings the wind, or whether the roof meets the building code and the manufacturer's warranty conditions where you live. The hourly rate is whatever you enter: a roofer's wage, a charge-out rate with overhead and profit, or your own time at zero.
On-site considerations for roofing time
Roofing is work at height and falls are the trade's main killer, so the time a crew actually takes includes rigging edge protection, anchors and lines before the first shingle goes down. In the US, OSHA's fall protection standard (29 CFR 1926.501) requires protection at 6 ft (1.8 m) on most construction work, with specific provisions for roofing; in the UK the Work at Height Regulations 2005, explained in the HSE's work-at-height guidance, require the work to be planned and the fall risk controlled, with collective protection such as edge guarding preferred. Add the setup to the working day or take it out of the productive hours, and never plan a roof around pushing a crew to finish before dark: the last hour is where the accidents are. Weather sets the calendar as much as the rate does; shingles seal in warmth and a wet deck is not walked on.
Codes and compliance
Hours are the same everywhere; what varies is who may do the work and what has to be inspected. Many US jurisdictions require a permit and an inspection for a re-roof, and the International Residential Code limits the number of shingle layers that may be stacked (two, in Section R908) and sets underlayment and fastening rules by wind zone. In England a replacement roof covering is building work under Approved Document L if more than half the roof is re-covered, and the thermal upgrade may be required at the same time; Australia's National Construction Code and Canada's provincial codes set their own fastening and wind rules. The manufacturer's installation instructions are usually a warranty condition in every market. None of this changes the arithmetic, but a code-triggered insulation upgrade or a second-layer strip can double the job.
Before you order
Measure the roof surface, not the plan, and add the pitch factor if you only have the footprint. Decide whether the figure is for one roofer or a crew and set the crew size to match, because the elapsed hours fall in proportion while the person-hours and the cost do not. Put the tear-off in from the Craftsman rates above, or from the quote, as a separate line. Then compare the person-hours with the quote: a roofer's price per square carries materials, tear-off, disposal, overhead and profit as well as labour, so a gap between this figure and the quote is usually those items, not a wrong rate.
Adjusting the defaults
Every input is editable and the result updates as you type. The production rate runs from 0.5 to 20 hours per square (0.05 to 2 hr/m²), wide enough for a shingle crew on a bungalow at one end and slate on a steep, cut-up roof at the other; the crew size is whole people and rounds if you type a fraction; the working hours per day are productive hours, so 8 on a clear day and less once setup, breaks and weather are taken out. The unit switch above the inputs converts the area and the rate between square feet and squares on the US side and square metres on the metric side.
Using this roofing time calculator alongside other BuildMetricLab tools
The tiling time calculator, painting time calculator and drywall time calculator use the same person-hours, crew and working-day arithmetic for the trades that follow the roof, each with its own Craftsman default rate. Every BuildMetricLab tool runs entirely in your browser, nothing you type is sent anywhere, and the formula is shown on the page so the maths can be audited.
Sources & methodology
Person-hours = roof surface area × production rate (hours per square, 100 ft², on the US side; hours per m² on the metric side; 1 hr per square = 0.1076 hr/m²); elapsed hours = person-hours ÷ crew size (whole people, rounded); working days = elapsed hours ÷ productive hours per day; labour cost = person-hours × hourly rate. The default rate of 1.83 hours per square (0.197 hr/m²) is the Craftsman National Construction Estimator 2026 allowance for one roofer (crew R1) to lay composition (Class C) or asphalt (Class A) shingles on a conventionally framed straight gable roof of 6:12 or less, from the preview edition; the same table gives 1.25 for built-up 3-ply roofing and 2.70 for 26-gauge steel. Tear-off is excluded and quoted from the Craftsman National Home Improvement Estimator 2026 preview: 1.33 hours per square for a single layer of asphalt shingles, 2.00 for a double layer, 1.65 for clay or concrete tile, 1.79 for slate and 2.02 for wood shingles. Pitch factors for converting a plan area to a roof surface are √(1 + (rise ÷ run)²): 1.118 at 6:12, 1.25 at 9:12, 1.414 at 12:12. Imperial areas are converted at 0.09290304 m² per ft² before the calculation. The rate is bounded at 0.5 to 20 hours per square (0.05 to 2 hr/m²). No wage data or prices are embedded; the hourly rate is your input.
- Craftsman Book Company: National Construction Estimator 2026, preview edition (conventionally framed roof assemblies: add for composition shingle or asphalt shingle roofing R1@1.83 per Sq; built-up 3-ply 1.25; 26 ga steel 2.70)
- Craftsman Book Company: National Home Improvement Estimator 2026, preview edition (roof cover demolition per Sq: asphalt shingles single layer BL@1.33, double layer 2.00, slate 1.79, wood 2.02, clay or concrete tile 1.65)
- UK Health and Safety Executive: Work at height (the Work at Height Regulations 2005, planning and collective protection)
Frequently asked questions
Are roofing time calculator results accurate enough to order materials?
This tool estimates labour hours, not materials; the shingle, tile and underlay quantities come from the roof area and the maker's coverage, with waste for hips, valleys and starter courses. The hours are exact for the rate you enter, and the default rate is a published one: Craftsman's 1.83 roofer-hours per square for composition or asphalt shingles on a straight gable of 6:12 or less. A cut-up or steep roof, tile or slate, tear-off, flashing and scaffold all add time that the default does not contain, so treat the figure as the laying time and build the rest of the day around it.
What wastage percentage should I use?
There is no wastage input, because the tool counts hours rather than shingles. The equivalent for labour is contingency: Craftsman's rate is for the easy case, and hips, valleys, dormers, penetrations, a steep pitch or a second storey each slow the crew, as does rigging edge protection before the first shingle goes down. Raising the production rate, or the working day, is the honest way to carry that; a roofer's quote will usually show where the extra hours went.
Does this replace professional advice?
No. It is a planning estimator for labour hours. Whether the deck can take the covering, how the fixings must resist the wind, whether a permit, an inspection or a thermal upgrade is triggered, and how the work at height is made safe are matters for the roofer, the local building code and the manufacturer's instructions: in the US the International Residential Code and OSHA's fall-protection rules, in the UK Approved Document L and the Work at Height Regulations, in Australia the National Construction Code, in Canada the provincial codes. For anything structural, consult a qualified professional.
Can I change the unit prices?
Yes. The hourly rate is editable and the labour cost is simply the person-hours multiplied by it, in the page currency; the defaults are planning figures, not local wage data. Enter the roofer's rate, a charge-out rate with overhead and profit, or zero for your own time. A roofer's price per square usually also carries materials, tear-off, disposal and profit, so it will sit above this labour-only figure.