What this tool does

Estimates the volume of mortar, and the sand and cement to make it, for a brick or concrete block wall from its area and a wastage allowance.

Estimates mortar volume, sand and cement bags for a brick or concrete block wall from its area, the wall type and a wastage allowance.

Inputs
ft²
%
Result

Mortar Volume Required

17.1 ft³ (0.48 m³)

Sand (approx)
19.6 ft³
Cement (94 lb bags)
4
Lime (if used)
53 lb
Price it on PlainEstimate

Opens these materials as a new estimate on PlainEstimate, our free estimate and invoice app.

Plain Estimate
From BrightScale Labs
Invoice maker
Quote at the door. Signed on the spot.
Estimates and invoices for trades, built while you are still in the room.
Scan to get
Get it onGoogle Play

People also use

Formula Used
V=A⋅r⋅(1+w),cement=275 V kgV = A \cdot r \cdot (1 + w),\quad \text{cement} = 275\,V\ \mathrm{kg}
VV
Mortar volume
AA
Wall area
rr
Mortar per unit area: brick 0.022, block 0.010 m³/m²
ww
Wastage allowance (decimal)

How the mortar calculator works

Mortar is the paste between bricks or blocks, and its volume depends on how much wall you lay and the joint size. This calculator takes the wall area and the wall type, multiplies by a mortar rate per unit area, and adds a wastage allowance. The formula is V = A × r × (1 + w). It then turns the volume into materials using an assumed mix of about 1 part cement to 6 parts sand by volume, which needs about 275 kg of cement and 1.15 m³ of dry sand for each cubic metre of wet mortar. The page works in ft² and ft³ and converts internally, so the metric and US-unit versions agree.

Example with the defaults on this page: 215 ft² of brick wall is 19.97 m². The mortar rate of 0.022 m³ per m² gives 0.439 m³ net, and 10% wastage makes 0.483 m³, which is 17.1 ft³ or 0.63 yd³. The cement is 0.483 × 275 = 133 kg, which is 293 lb, or 3.1 bags of 94 lb, so 4 bags. The dry sand is 0.483 × 1.15 = 0.556 m³, which is 19.6 ft³.

Block uses less mortar. The same 215 ft² of concrete block needs 0.200 m³ net and 0.220 m³ with wastage, which is 7.8 ft³, with 60.4 kg (133 lb) of cement, or 1.4 bags of 94 lb, so 2 bags. As a check on the brick rate, modular brick laid with 3/8 in joints is about 6.75 bricks per ft², and mortar needs about 9 ft³ per 1,000 bricks, so 215 ft² is about 1,450 bricks and 13 ft³ of mortar. The tool's 15.5 ft³ net is higher by design.

Typical US concrete and foundations wastage

The 10% wastage covers mortar that is dropped, left on the board or in the mixer, and lost when a batch goes off. It is a trade habit and not a published standard. Experienced masons waste less, and a first-time job, a windy site or a slow pace waste more. Mortar starts to stiffen, so mix in batches you can use within about two hours, and do not add water to a stiffened mix without checking the guidance for the mortar. The per-area rates already include some extra for squeezed-out mortar, so the wall total is generous.

What this tool does not do

It does not choose the mortar type or strength, which the design and the exposure decide. It does not size a wall, add the cost of ties, reinforcement, damp-proof courses or the bricks and blocks, or work out the number of units. It assumes a single-skin wall, so a double-skin or thicker wall needs the area counted for each skin. It does not cover stone, thin-bed or pre-blended mortar, and it does not price anything.

On-site considerations for mortar

Many US masons buy pre-blended Type N or Type S mortar mix by the bag, and the yield per bag is on the label, so divide the mortar volume by it. The right mix depends on the units and the exposure. A 1:6 mix is a fairly weak, flexible mortar. A stronger 1:4 mix needs about 40% more cement, since a cubic metre of mortar then holds about 385 kg of cement against 275 kg, and it is harder and more brittle. In the United States, ASTM C270 specifies mortar for unit masonry in types M, S, N and O by strength, and the design or code says which type to use. Use the mortar the design specifies, because mortar that is stronger than the units can crack them, and a weak mortar in an exposed wall will weather.

Keep the sand clean and consistent, because dirty or varying sand changes the strength and colour. Protect fresh work from rain, frost and fast drying. Wet cement and lime are alkaline and burn skin and eyes, so wear gloves and eye protection, and wash splashes off at once.

Codes and compliance

Laying a garden wall does not always need a permit, but a wall that carries load, retains soil or forms part of a building does. Walls over a certain height, near a boundary or on a slope can also need approval, and the limits differ by place. In the United States, ASTM C270 specifies mortar for unit masonry in types M, S, N and O by strength, and the design or code says which type to use. Ask your local authority before you start, and use an engineer for anything structural.

Before you order

Measure the wall face, subtract the openings, and decide the unit type and joint size. Check the mortar the design specifies. Convert the cement to bags and round up, and order sand a little over, because it is cheap and a short load stops the job. Ask whether the supplier sells it by the 94 lb bag, by the tonne or by the cubic yard or metre, and compare on the same basis. Buy cement in dry, sealed bags and store it off the ground, because damp cement sets in the bag.

Adjusting the defaults

The wall area, the wall type and the wastage are editable. The area must be above zero and the wastage zero or more. A blank or zero field is refused instead of silently using a default. If your supplier's mix or yield differs, use their figures for the cement and sand, and use this tool for the mortar volume.

Using this mortar calculator alongside other BuildMetricLab tools

Pair this estimate with the brick and block calculators to count the units, and with the concrete mix and screed calculators for other cement work. All BuildMetricLab tools run in your browser. Nothing you type is sent anywhere, and every formula is shown on the page so you can audit the maths.

Sources & methodology

Mortar volume = wall area × rate × (1 + wastage ÷ 100). The rate is 0.022 m³ per m² of single-skin brickwork and 0.010 m³ per m² of concrete blockwork, equal to 0.072 and 0.033 ft³ per ft². As a check, brickwork of 215 × 102.5 × 65 mm bricks with 10 mm joints needs about 0.018 m³ of mortar per m² of wall, so the brick rate allows about 20% more for mortar squeezed from the joints, bed furrowing and frog filling. The page takes area in ft² and converts it (1 ft² = 0.0929 m²). Materials follow from a mix of about 1 part cement to 6 parts sand by volume: 275 kg of cement (about 6.5 bags of 94 lb) and 1.15 m³ of dry sand per m³ of wet mortar, which is 1.34 m³ of dry materials. A stronger 1:4 mix needs about 40% more cement. Bag counts are rounded up. The lime row is 50 kg per m³ for a lime-modified mix and is shown for reference. The area must be above zero, the wastage zero or more, and a wall type must be chosen. The tool assumes single-skin walls, and does not size reinforcement, ties, or pre-blended mortar.

Frequently asked questions

Are mortar calculator results accurate enough to order materials?

They are a sound starting quantity. The mortar volume is the wall area times a rate per unit area, plus wastage, so it is only as good as your area and the joint size you actually lay. Cement and sand follow from an assumed mix of about 1 part cement to 6 parts sand by volume. A different mix, or pre-blended mortar sold by the bag, changes the bags, so check the supplier's yield per bag.

What wastage percentage should I use?

The default of 10% covers droppings, mixing losses and mortar left over. Experienced masons may use 5%, and a first-time job or a windy site may need more. It is a trade habit and not a published standard. The tool already includes an allowance in the per-area rate for mortar squeezed out of the joints and filling the bricks.

Does this replace professional advice?

No. It estimates materials only. It does not choose the mortar type, check the wall design or confirm that it meets code. Load-bearing and retaining walls, and walls in exposed or below-grade locations, need a qualified engineer and the mortar type the design specifies.

Can I change the unit prices?

This tool has no price fields. It gives volumes and bag counts, and you multiply by your supplier's prices. You can change the wall area, the wall type and the wastage. The area must be above zero and the wastage zero or more.