BuildMetricLab

Plumbing & Heating

In-Floor Heating Tubing Calculator

Calculates the length of PEX tubing for an in-floor heating loop from area and spacing

Updated October 13, 2026 · Live

What this tool does

Calculates the length of PEX tubing for a hydronic in-floor heating system from the heated floor area and the tube spacing, with a 10% allowance for return bends and the leaders to the manifold, the tube per unit area and the number of loops at 300 ft (91 m).

Estimates the metres or feet of PEX needed from your heated area and tube spacing, adds 10% for bends and the manifold leaders, and counts the loops at a 300 ft (91 m) planning length.

Inputs
ft²
in
$/ft
Result

PEX Tubing Required

946 ft

Heated Area
860.0 ft²
Tube Spacing
12.0 in
Tube in the Floor
860 ft (1.10 ft of tube per ft² with the allowance)
Allowance
+10% for return bends and the leaders to the manifold: 86 ft
Loops at 300 ft (91 m)
4 loops of about 237 ft each, 1/2 in (16 mm) tube
Estimated Cost
$709.50
Loop Note
MrPEX guideline: 3/8 in tube 200 ft (61 m) recommended, 250 ft max; 1/2 in 300 ft (91 m), 350 ft max. UK 16 mm pipe: 100 m (Wunda). Confirm against the heat load and the maker's design manual
Price it on PlainEstimate

Opens these materials as a new estimate on PlainEstimate, our free estimate and invoice app.

Plain Estimate
From BrightScale Labs
Invoice maker
Quote at the door. Signed on the spot.
Estimates and invoices for trades, built while you are still in the room.
Scan to get
Get it onGoogle Play

People also use

Formula Used
L=As⋅1.1L = \frac{A}{s} \cdot 1.1
LL
PEX tubing length (ft)
AA
Heated floor area (ft²)
ss
Tube spacing (ft)
1.11.1
This calculator's 10% allowance for return bends and the leaders to the manifold

How the in-floor heating tubing calculator works

Divide the heated floor area by the centre-to-centre spacing of the tube and you have the length of PEX that will lie in the floor, because each metre of tube "owns" a strip of floor one spacing wide. The calculator then adds 10% for the return bends at the end of each run and the leaders from the edge of the heated area back to the manifold, and prices the total at the per-length figure you enter. With the defaults, 80 m² at 300 mm centres is 267 m of tube in the floor and 293 m with the allowance; on the US side, 860 ft² at 12 in centres is 860 ft in the floor and 946 ft in all. MrPEX's installation guide states the same rule as a multiplier on square feet: 12 divided by the spacing in inches, so 1 ft of tube per ft² at 12 in, 1.33 at 9 in and 2 at 6 in. In metric the multiplier is 1,000 divided by the spacing in millimetres, which is why 150 mm centres need 6.67 m of tube per m² against 3.33 m at 300 mm.

The 10% is this calculator's planning allowance, not a manufacturer figure. The bends are small; it is the leaders that vary, because every loop runs to the manifold and back, so a loop whose far end is 8 m (26 ft) from the manifold carries 16 m (52 ft) of tube that heats a corridor rather than the room. If the manifold sits outside the heated area, measure the leaders and add them yourself.

Choosing a tube spacing

Closer spacing puts more tube in the floor, which raises the output at a given water temperature and evens out the surface temperature; it also costs more tube and asks for tighter bends. MrPEX's guideline for tube embedded in a slab or a poured underlayment is 6 to 12 in (150 to 300 mm), with 12 in as the maximum, and 8 in (200 mm) between joists. Its guide adds that spacing is usually tightened in front of windows, where the heat loss is highest, and in barefoot areas such as bathrooms, where an even surface matters more than the load. Wunda's fact sheet for UK solid floors gives 150 to 350 mm centres depending on the job, with a maximum output of 100 to 120 W/m² (32 to 38 BTU/h per ft²). As a rule, 300 mm (12 in) suits a living space with modest heat loss, 200 mm (8 in) a kitchen or a room with a lot of glass, and 150 mm (6 in) a bathroom, an entrance or a poorly insulated room. The spacing decides how much tube you buy, so run the calculator once per room at the spacing that room needs rather than once for the house.

Loop lengths and the manifold

A loop that is too long has too much pressure drop for the circulator to push warm water round it, so the tube is split into several loops of similar length that all return to one manifold. The calculator counts loops at 300 ft (91 m), which is MrPEX's recommended length for 1/2 in tube (350 ft maximum); its guideline for 3/8 in tube is 200 ft (61 m) recommended and 250 ft maximum, and for 5/8 in 350 ft recommended. UK practice with 16 mm pipe is similar: Wunda's solid-floor sheet gives 100 m per loop. The default 293 m therefore wants four loops of about 73 m, and 946 ft wants four of about 237 ft. These are rules of thumb, and MrPEX says so: loop lengths are designed for a heat load at a given temperature drop and pressure drop, so a high-loss room needs shorter loops and a low-loss one can run longer. Size the manifold for the loop count, and keep the loops within a few metres of each other in length so the manifold can be balanced.

What this tool does not do

It estimates tubing length only. It does not calculate the heat loss of the room, which is what actually fixes the spacing, the water temperature and the loop length; it does not size the boiler, heat pump or circulator; and it does not design the manifold, the mixing valve or the controls. Those are the work of a hydronic designer or mechanical contractor working to the tube maker's design manual and the local mechanical code (CSA B214 in Canada, the mechanical and plumbing codes adopted in your state in the US, BS EN 1264 for floor heating design in the UK and Europe). Nor does it know whether your floor construction, insulation and floor covering can deliver the output the spacing implies.

Adjusting the defaults

Every input is editable and the result updates as you type. The heated area is the floor you will actually put tube under, so leave out the strip under kitchen units, a bath or a fixed wardrobe, which no installer heats. The spacing is centre to centre; the slider runs from 100 to 400 mm (4 to 16 in) and MrPEX's own maximum for a slab is 300 mm (12 in). The price is per metre or per foot of tube and the cost line is simply length times price, so it excludes the manifold, fittings, staples, insulation and the designer's time. Run the tool once per room or zone and add the loops together for the whole job.

On-site considerations

Pressure-test every loop with air or water before the pour and keep it under pressure while the concrete or screed goes down, so a nicked tube shows up before it is buried. Fix the PEX at the spacing you planned, with a tape or a story pole marked on the insulation if you are using staples, because drift widens the cold stripes in the floor and the gaps are most visible near the manifold and wherever the spacing tightens. Insulate under and around the slab so the heat goes up, not into the ground. And resist couplings in the floor: a loop is one unbroken length from manifold to manifold wherever the coil allows it, which is one more reason to keep loops within the lengths above.

Using this alongside other BuildMetricLab tools

Pair this with the concrete slab calculator or the floor screed calculator for the pour that covers the tube, and the pipe insulation calculator for the flow and return runs to the manifold. Every BuildMetricLab tool runs in your browser, nothing you type is sent anywhere, and the formula is shown on the page so you can audit the maths.

Sources & methodology

Tube in the floor = heated area ÷ centre-to-centre spacing, the rule MrPEX's Heating Installation Guide (2020) gives as a multiplier on square feet of 12 ÷ spacing in inches (1 at 12 in, 1.33 at 9 in, 2 at 6 in); in metric the multiplier is 1,000 ÷ spacing in millimetres. Total = tube in the floor × 1.1, a 10% planning allowance of this calculator's own for return bends and the leaders to the manifold. Loops = ⌈total ÷ 91.44 m⌉, using the 300 ft that MrPEX recommends for 1/2 in tube (350 ft maximum; 3/8 in 200 ft recommended and 250 ft maximum; 5/8 in 350 ft recommended and 500 ft maximum), close to the 100 m that Wunda gives for 16 mm pipe in UK solid floors. Cost = total length × price per metre or foot. Imperial inputs are converted at 0.09290304 m² per ft², 25.4 mm per inch and 0.3048 m per foot before the calculation. Spacing guidance (6 to 12 in in slab and poured underlayment, 8 in between joists, tighter at windows and in bathrooms) is MrPEX's; 150 to 350 mm centres and 100 to 120 W/m² maximum output are Wunda's. Loop length in practice depends on the heat load, temperature drop and pump head, and no prices or rates are embedded.

Frequently asked questions

Are in-floor heating tubing calculator results accurate enough to order materials?

For the tube in the floor, yes: area divided by spacing is exact for a serpentine or counterflow layout, and MrPEX's installation guide uses the same multiplier (12 divided by the spacing in inches, or 1,000 divided by the spacing in millimetres). The 10% is a planning allowance for return bends and the leaders to the manifold; if the manifold sits outside the heated area, measure the leaders (there and back for every loop) and add them. The order should match the coil sizes your supplier stocks, with each loop as one unbroken length.

What wastage percentage should I use?

The calculator adds a fixed 10% for the return bends and the leaders to the manifold, which suits a room where the manifold is close by. There are no offcuts to speak of, because loops are run as continuous lengths, but a manifold 8 m (26 ft) from the far edge of the room adds 16 m (52 ft) of leader to every loop, and that can exceed 10% on a small room. Measure the leader run and add it, rather than raising the percentage.

Does this replace professional advice?

No. The spacing, water temperature and loop lengths of a hydronic floor come from a room-by-room heat-loss calculation and the tube maker's design manual, and the installation is governed by the local mechanical code (CSA B214 in Canada, the state-adopted mechanical and plumbing codes in the US, BS EN 1264 for design in the UK and Europe). This tool only turns an area and a spacing into a length of tube; have a hydronic designer or mechanical contractor confirm the design before you buy.

Can I change the unit prices?

Yes. The price per metre or per foot is editable and the cost line is simply the total length multiplied by that price, in the page currency. Put in your supplier's quote for the tube size you will use; the total does not include the manifold, fittings, staples or insulation.

Spotted something off?

Calculations or display — let us know.

Calculators from other categories that planners often reach for next.