Contractor Labor Cost Calculator
Estimates loaded labour cost from hours, hourly rate, crew size and employer burden
Updated October 14, 2026 · Live
What this tool does
Estimates loaded labour cost from hours per crew member, hourly rate, crew size and the employer burden percentage, with direct wages, burden and the loaded rate per person-hour and crew-hour.
Contractor Labor Cost Calculator: hours × hourly rate × crew size × (1 + burden), with direct wages, the burden amount and the loaded rate per person-hour and per crew-hour.
People also use
Formula Used
How the contractor labor cost calculator works
Loaded labour cost = hours × hourly rate × crew size × (1 + burden). Type the hours each person will work, their hourly wage, how many of them there are and the employer's on-cost percentage, and the calculator gives the direct wages, the burden on top, the total, and the loaded rate per person-hour and per crew-hour. With the defaults, two people for 40 hours at $55 is 80 crew-hours and $4,400 in wages; a 25 percent burden adds $1,100 for a loaded cost of $5,500, which is $68.75 per person-hour or $137.50 for every hour the pair is on site.
The hours field is the duration each crew member works, not the sum across the crew. The calculator multiplies by crew size for you, so a three-person crew for a five-day week is 40 hours and a crew of 3, which it reports as 120 crew-hours. Nothing in the result is a market rate; every figure comes from what you type, in whatever currency your quote is in.
Typical labor burden and contingency
Burden is the gap between what a worker is paid and what they cost to employ: payroll taxes, workers' compensation and liability insurance, paid leave, pension or health contributions, training and the time spent on the job that nobody bills. The US Bureau of Labor Statistics measures it directly. In its Employer Costs for Employee Compensation release for June 2026, private-industry employers paid $32.82 an hour in wages and $14.07 in benefits, so benefits were 30.0 percent of total compensation and 42.9 percent on top of wages. The default of 25 percent is deliberately below that average, because a small crew's benefits are usually thinner than the economy-wide figure and because some of what BLS counts as benefits (paid holidays, for instance) is already inside an hourly rate quoted for hours actually worked. If you are costing a payroll with full benefits, 40 to 45 percent is closer to the measured number.
The same idea applies everywhere, under different names. Eurostat's figures for 2025 put non-wage costs at 24.8 percent of total labour costs across the EU and 25.6 percent in the euro area, which is 33 and 34 percent on top of wages, and construction was the lowest-cost sector at €31.5 an hour across the EU. Employer social contributions, compulsory pension contributions, holiday pay and statutory insurance in the United Kingdom, Canada, Australia and elsewhere all belong in the burden field, at the percentage your own payroll shows. Contingency is a different thing: it covers unknown scope rather than known on-costs, and it belongs on the project budget as its own line, not inside the labour rate.
What this tool does not do
It does not know how many hours the job takes. That is the hard part of any labour estimate, and it comes from a production rate, a previous job or the labour-hours tools, not from this page. It does not add overhead or profit, so if you are a contractor pricing work, the loaded cost here is your cost, and the markup calculator turns it into a price. It does not apply overtime premiums, travel time or per diems, and it cannot tell the difference between a wage and a charge-out rate, which is why the burden note under the result exists.
On-site considerations for contractor labor cost
The usual error is burdening a rate that is already burdened. A contractor's quoted hourly rate, the $85 an hour on an invoice, includes their taxes, insurance and profit; applying 25 percent to it double counts, so set burden to zero and the 16 hours at $85 come out at $1,360, which is what the invoice will say. The 25 percent is for raw wages on your own payroll. The second mistake is confusing elapsed time with crew-hours: a crew of six on site for four weeks at 40 hours is 960 crew-hours, and at $48 an hour with a 35 percent burden that is $46,080 in wages and $62,208 loaded, before a single material is counted.
Codes and compliance
Rules differ by country, so check the ones where the work is done. In the United States, whether someone on site is an employee or an independent contractor is decided by the federal tax and labour department tests, not by what the contract calls them, and the answer changes who carries the payroll tax and insurance in the burden figure. Wage, overtime and prevailing-wage rules apply to many public and some private projects, and workers' compensation insurance is mandatory for employees in almost every state. In the United Kingdom the Construction Industry Scheme and employment-status rules play the same role; in Australia it is the compulsory pension contribution and award rates. None of these are in the calculator, because they change with legislation, and all of them belong in the burden percentage you enter.
Before you order
Ask the contractor whether the rate is a wage or a charge-out figure and whether hours are per person or for the crew, then enter them the same way here. Compare the loaded cost against a written quote for the same scope; a difference usually traces to hours, not to the rate. Fixed-price contracts are rare on remodelling work, and a time-and-materials job with a not-to-exceed cap is only as good as the hours estimate behind it, so agree the hours and the crew before the rate.
Adjusting the defaults
Every field is editable and the result updates as you type. Hours accept any positive figure, including fractions of an hour, crew size runs from 1 to 20, and burden from 0 to 60 percent. Set burden to 0 for a quoted rate, around 25 percent for a lightly benefited small crew, and 40 to 45 percent for a fully benefited payroll in line with the BLS average; the loaded-rate line shows what each setting does to the hourly figure, so $55 becomes $68.75 at 25 percent and $78.60 at 42.9 percent. The currency symbol follows the site setting, and the arithmetic is the same in dollars, pounds or euros.
Using this contractor labor cost calculator alongside other BuildMetricLab tools
The labour-hours and task-time calculators produce the hours this tool needs. The material cost calculator covers the other half of a job's direct cost, the build budget calculator adds contingency as its own line, and the build timeline calculator turns crew-hours back into calendar weeks. Every BuildMetricLab tool runs in your browser, with no sign-up and no data sent anywhere, and the formula is shown on the page so the maths can be checked.
Sources & methodology
Loaded labour cost = hours × hourly rate × crew size × (1 + burden ÷ 100), where hours are the working hours per crew member, so crew-hours = hours × crew. Direct wages, the burden amount, and the loaded rate per person-hour and per crew-hour are shown. Burden is the employer's on-cost as a percentage of wages. The 25% default is a small-crew figure; the US Bureau of Labor Statistics' Employer Costs for Employee Compensation (June 2026) puts private-industry benefits at 30.0% of compensation, which is 42.9% on top of wages, and Eurostat (2025) puts EU non-wage costs at 24.8% of total labour cost, about 33% on top of wages. No overhead, profit, overtime or contingency is applied. Inputs are validated: hours and rate above zero, crew size at least one, burden not negative.
- US Bureau of Labor Statistics, Employer Costs for Employee Compensation, June 2026 (wages $32.82 and benefits $14.07 per hour, private industry)
- US Bureau of Labor Statistics, The Economics Daily: compensation costs for private industry workers averaged $46.89 per hour worked in June 2026
- Eurostat, Statistics Explained: Hourly labour costs (2025; non-wage costs 24.8% of total labour costs in the EU)
- US Internal Revenue Service: independent contractor (self-employed) or employee?
Frequently asked questions
Are contractor labor cost calculator results accurate enough to order materials?
This tool does not estimate materials at all; it prices labour. The arithmetic is exact for the hours, rate, crew and burden you enter, so the result is as good as those four figures, and hours are the one that moves most. Use it to check a quote or build a budget line, and take the hours from a production rate or a previous job rather than a guess.
What wastage percentage should I use?
There is no wastage on labour. The percentage field here is labour burden, the employer's on-cost on wages: payroll taxes, workers' compensation and insurance, paid leave, pension or benefits. The US Bureau of Labor Statistics measured benefits at 42.9 percent on top of wages for private industry in June 2026; the 25 percent default suits a small crew with limited benefits. Set it to zero if the hourly rate is a contractor's quoted charge-out rate, which already includes it.
Does this replace professional advice?
No. It is a planning estimate. Whether a worker counts as an employee or a contractor, which taxes and insurance apply, and what the law requires on a given site are questions for a qualified estimator, accountant or the rules in your country, and for work affecting structure, building codes, gas, electrical, plumbing or drainage a licensed contractor or design professional is needed in any case.
Can I change the unit prices?
Yes. The hourly rate is the only price, and it is entered in the page currency; the arithmetic is the same in dollars, pounds or euros. Change the burden percentage alongside it: a wage needs a burden, a quoted contractor rate does not. The loaded-rate line under the result shows the combined effect per person-hour and per crew-hour.
Spotted something off?
Calculations or display — let us know.
Related tools
Calculators from other categories that planners often reach for next.